检索范围:
排序: 展示方式:
Analysis of Sydney’s recycled water schemes
Zhuo CHEN, Huu Hao NGO, Wenshan GUO, Xiaochang WANG
《环境科学与工程前沿(英文)》 2013年 第7卷 第4期 页码 608-615 doi: 10.1007/s11783-012-0468-x
关键词: recycled water schemes end use water quality public attitudes integrated water planning and management
LU Chun-guang, MENG Li-li
《机械工程前沿(英文)》 2006年 第1卷 第3期 页码 305-312 doi: 10.1007/s11465-006-0039-6
关键词: PBOM systematic technological implementation technology management workflow technology
Water environmental planning and management at the watershed scale: A case study of Lake Qilu, China
HUANG Kai, GUO Huaicheng, LIU Yong, ZHOU Feng, YU Yajuan, WANG Zhen
《环境科学与工程前沿(英文)》 2008年 第2卷 第2期 页码 157-162 doi: 10.1007/s11783-008-0011-2
关键词: Province environmental planning management traditional watershed approach
A comparison of the water management systems in France and China
Xiaoliu YANG, Jian XU, Jean-Fran?ois DONZIER, Coralie NOEL
《环境科学与工程前沿(英文)》 2013年 第7卷 第5期 页码 721-734 doi: 10.1007/s11783-013-0550-z
关键词: legislation regulation water policy integrated river basin management protection of water quality water permitting
《化学科学与工程前沿(英文)》 2023年 第17卷 第10期 页码 1516-1532 doi: 10.1007/s11705-022-2283-7
关键词: planning scheduling refinery-petrochemical convolutional neural network heuristic algorithm
Integrated transmission and generation planning model in a deregulated environment
Enrique B. CEDE?O, Sant ARORA
《能源前沿(英文)》 2013年 第7卷 第2期 页码 182-190 doi: 10.1007/s11708-013-0256-8
关键词: integrated planning indicative plans power generation transmission deregulation
Muhammad Farhan AUSAF,Liang GAO,Xinyu LI
《机械工程前沿(英文)》 2015年 第10卷 第4期 页码 392-404 doi: 10.1007/s11465-015-0353-y
For increasing the overall performance of modern manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem.
关键词: integrated process planning and scheduling (IPPS) dispatching rules priority based optimization algorithm multi-objective optimization
System engineering for water pollution control at the watershed level in China
Wei MENG,
《环境科学与工程前沿(英文)》 2009年 第3卷 第4期 页码 443-452 doi: 10.1007/s11783-009-0037-0
关键词: water pollution control watershed system engineering sustainability integrated watershed management key specific project of science and technology
Energy storage resources management: Planning, operation, and business model
《工程管理前沿(英文)》 页码 373-391 doi: 10.1007/s42524-022-0194-4
关键词: energy storage system energy storage resources management planning configuration operational management business model
Applying an Integrated Systems Perspective to the Management of Engineering Projects
Simon P. Philbin
《工程管理前沿(英文)》 2015年 第2卷 第1期 页码 19-30 doi: 10.15302/J-FEM-2015004
关键词: integrated systems perspective engineering projects management
Wen Ling
《工程管理前沿(英文)》 2015年 第2卷 第2期 页码 173-177 doi: 10.15302/J-FEM-2015029
关键词: coal-based integrated energy systems engineering exploration practice
Lynda M. BOURNE, Patrick WEAVER
《工程管理前沿(英文)》 2018年 第5卷 第2期 页码 150-166 doi: 10.15302/J-FEM-2018012
关键词: time management scheduling CPM PERT Gantt Critical Path bar chart
Airline planning and scheduling: Models and solution methodologies
Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE
《工程管理前沿(英文)》 2020年 第7卷 第1期 页码 1-26 doi: 10.1007/s42524-020-0093-5
关键词: airline planning fleet assignment problem aircraft routing problem crew pairing problem crew rostering problem crew scheduling problem integrated planning
An integrated assessment method of urban drainage system: A case study in Shenzhen City, China
DONG Xin, ZENG Siyu, CHEN Jining, ZHAO Dongquan
《环境科学与工程前沿(英文)》 2008年 第2卷 第2期 页码 150-156 doi: 10.1007/s11783-008-0014-z
关键词: integrated assessment hierarchy process centralized technological feasibility planning
Integrated river basin management in rapidly urbanizing areas: a case of Shenzhen, China
Lei LIU, Xiaoming MA
《环境科学与工程前沿(英文)》 2011年 第5卷 第2期 页码 243-254 doi: 10.1007/s11783-010-0276-0
关键词: integrated river basin management (IRBM) model Longgang River basin Shenzhen decentralization stakeholder participation
标题 作者 时间 类型 操作
Analysis of Sydney’s recycled water schemes
Zhuo CHEN, Huu Hao NGO, Wenshan GUO, Xiaochang WANG
期刊论文
Computer aided process planning system based on workflow technology and integrated bill of material tree
LU Chun-guang, MENG Li-li
期刊论文
Water environmental planning and management at the watershed scale: A case study of Lake Qilu, China
HUANG Kai, GUO Huaicheng, LIU Yong, ZHOU Feng, YU Yajuan, WANG Zhen
期刊论文
A comparison of the water management systems in France and China
Xiaoliu YANG, Jian XU, Jean-Fran?ois DONZIER, Coralie NOEL
期刊论文
Enterprise-wide optimization of integrated planning and scheduling for refinery-petrochemical complex
期刊论文
Integrated transmission and generation planning model in a deregulated environment
Enrique B. CEDE?O, Sant ARORA
期刊论文
Optimization of multi-objective integrated process planning and scheduling problem using a priority based
Muhammad Farhan AUSAF,Liang GAO,Xinyu LI
期刊论文
Applying an Integrated Systems Perspective to the Management of Engineering Projects
Simon P. Philbin
期刊论文
Exploration and Practice in Systems Engineering Management of Large Coal-based Integrated Energy Projects
Wen Ling
期刊论文
The origins of schedule management: the concepts used in planning, allocating, visualizing and managing
Lynda M. BOURNE, Patrick WEAVER
期刊论文
Airline planning and scheduling: Models and solution methodologies
Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE
期刊论文
An integrated assessment method of urban drainage system: A case study in Shenzhen City, China
DONG Xin, ZENG Siyu, CHEN Jining, ZHAO Dongquan
期刊论文