资源类型

期刊论文 1706

年份

2024 1

2023 122

2022 161

2021 122

2020 95

2019 97

2018 84

2017 87

2016 84

2015 97

2014 90

2013 73

2012 84

2011 61

2010 84

2009 52

2008 58

2007 49

2006 34

2005 22

展开 ︾

关键词

可持续发展 22

管理 21

工程管理 18

水资源 16

细水雾 14

项目管理 8

三峡工程 7

规划 7

风险管理 7

泥水盾构 6

优化 5

信息化 5

反渗透 5

工程 5

创新 4

建设管理 4

技术创新 4

水环境 4

砂卵石地层 4

展开 ︾

检索范围:

排序: 展示方式:

Analysis of Sydney’s recycled water schemes

Zhuo CHEN, Huu Hao NGO, Wenshan GUO, Xiaochang WANG

《环境科学与工程前沿(英文)》 2013年 第7卷 第4期   页码 608-615 doi: 10.1007/s11783-012-0468-x

摘要: Recycled water provides a viable opportunity to partially supplement fresh water supplies as well as substantially alleviate environmental loads. Currently, thousands of recycled water schemes have been successfully conducted in a number of countries and Sydney is one of the leading cities, which has made massive effort to apply water reclamation, recycling and reuse. This study aims to make a comprehensive analysis of recycled water schemes in Sydney for a wide range of end uses such as landscape irrigation, industrial process uses and residential uses (e.g., golf course irrigation, industrial cooling water reuse, toilet flushing and clothes washing etc.). For each representative recycled water scheme, this study investigates the involved wastewater treatment technologies, the effluent quality compared with specified guideline values and public attitudes toward different end uses. Based on these obtained data, multi criteria analysis (MCA) in terms of risk, cost-benefit, environmental and social aspects can be performed. Consequently, from the analytical results, the good prospects of further expansion and exploration of current and new end uses were identified toward the integrated water planning and management. The analyses could also help decision makers in making a sound judgment for future recycled water projects.

关键词: recycled water schemes     end use     water quality     public attitudes     integrated water planning and management    

Computer aided process planning system based on workflow technology and integrated bill of material tree

LU Chun-guang, MENG Li-li

《机械工程前沿(英文)》 2006年 第1卷 第3期   页码 305-312 doi: 10.1007/s11465-006-0039-6

摘要: It is extremely important for procedure of process design and management of process data for product life cycle in Computer Aided Process Planning (CAPP) system, but there are many shortcomings with traditional CAPP system in these respects. To solve these questions, application of workflow technology in CAPP system based on web-integrated Bill of Material (BOM) tree is discussed, and a concept of integrated BOM tree was brought forward. Taking integrated BOM as the thread, CAPP systematic technological process is analyzed. The function, system architecture, and implementation mechanism of CAPP system based on Browser/Server and Customer/Server model are expatiated. Based on it, the key technologies of workflow management device were analyzed. Eventually, the implementation mechanism of integrated BOM tree was analyzed from viewpoints of material information encoding, organization node design of integrated BOM tree, transformation from Engineering BOM (EBOM) to Process BOM(PBOM), and the programming implementation technology.

关键词: PBOM     systematic technological     implementation technology     management     workflow technology    

Water environmental planning and management at the watershed scale: A case study of Lake Qilu, China

HUANG Kai, GUO Huaicheng, LIU Yong, ZHOU Feng, YU Yajuan, WANG Zhen

《环境科学与工程前沿(英文)》 2008年 第2卷 第2期   页码 157-162 doi: 10.1007/s11783-008-0011-2

摘要: Water environmental planning and management has become essential for guiding the water pollution control activities. Past water pollution control activities have been site specific, with little thought on water quality standard reaching at the watershed scale. Based on the watershed approach, a seven-step methodological framework for water environmental planning and management was developed. The framework was applied to water environmental planning and management of the Lake Qilu watershed in Yunnan Province, China. Results show that the reduction amount of total nitrogen (TN) under the plan is 1,205 tons per year so that the target of environmental capacity can be reached in 2020. Compared with traditional methods, the framework has its prevalence and could be generalized to analogous watersheds.

关键词: Province     environmental planning     management     traditional     watershed approach    

A comparison of the water management systems in France and China

Xiaoliu YANG, Jian XU, Jean-Fran?ois DONZIER, Coralie NOEL

《环境科学与工程前沿(英文)》 2013年 第7卷 第5期   页码 721-734 doi: 10.1007/s11783-013-0550-z

摘要: This paper compares legal systems for water management in France and China, with a focus on integrated water resources management and regarding in particular the formulation of policies and their implementation. The research shows that China has committed itself to the efficient management of water resources through the development of various policy tools during the current period. This commitment, however, has often been interrupted and distorted by politics, resulting in the neglect of socioeconomic and environmental priorities. France has developed a legislative framework and practical instruments to apply integrated water resources management at the river basin level since the 1960s. This experience and the current implementation of the European Water Framework Directive brings elements that can contribute to Chinese society meeting its water challenges.

关键词: legislation     regulation     water policy     integrated river basin management     protection of water quality     water permitting    

Enterprise-wide optimization of integrated planning and scheduling for refinery-petrochemical complex

《化学科学与工程前沿(英文)》 2023年 第17卷 第10期   页码 1516-1532 doi: 10.1007/s11705-022-2283-7

摘要: This paper focuses on the integrated problem of long-term planning and short-term scheduling in a large-scale refinery-petrochemical complex, and considers the overall manufacturing process from the upstream refinery to the downstream petrochemical site. Different time scales are incorporated from the planning and scheduling subproblems. At the end of each discrete time period, additional constraints are imposed to ensure material balance between different time scales. Discrete time representation is applied to the planning subproblem, while continuous time is applied to the scheduling of ethylene cracking and polymerization processes in the petrochemical site. An enterprise-wide mathematical model is formulated through mixed integer nonlinear programming. To solve the problem efficiently, a heuristic algorithm combined with a convolutional neural network (CNN), is proposed. Binary variables are used as the CNN input, leading to the integration of a data-driven approach and classical optimization by which a heuristic algorithm is established. The results do not only illustrate the detailed operations in a refinery and petrochemical complex under planning and scheduling, but also confirm the high efficiency of the proposed algorithm for solving large-scale problems.

关键词: planning     scheduling     refinery-petrochemical     convolutional neural network     heuristic algorithm    

Integrated transmission and generation planning model in a deregulated environment

Enrique B. CEDE?O, Sant ARORA

《能源前沿(英文)》 2013年 第7卷 第2期   页码 182-190 doi: 10.1007/s11708-013-0256-8

摘要: After the deregulation of the Power Sector in the U.S., planning for generation and transmission capacities is decentralized. There is, however, still need for the long term integrated planning of generation and transmission capacities at the macro level, since these two sectors must operate in a coordinated manner. This paper presents a model for integrating generation and transmission expansion planning to identify an indicative expansion plan for the total sector at the macro level. The argument for an integrated model is supported using evidence from integrated planning efforts in real life systems. The application of the proposed model is illustrated using an example that requires expansion of generation and transmission capacities over three regions in a deregulated power system. The example considers that addition of generating capacity should come from renewable sources. The test results show the potential cost saving from integrated planning.

关键词: integrated planning     indicative plans     power generation     transmission     deregulation    

Optimization of multi-objective integrated process planning and scheduling problem using a priority based

Muhammad Farhan AUSAF,Liang GAO,Xinyu LI

《机械工程前沿(英文)》 2015年 第10卷 第4期   页码 392-404 doi: 10.1007/s11465-015-0353-y

摘要:

For increasing the overall performance of modern manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem.

关键词: integrated process planning and scheduling (IPPS)     dispatching rules     priority based optimization algorithm     multi-objective optimization    

System engineering for water pollution control at the watershed level in China

Wei MENG,

《环境科学与工程前沿(英文)》 2009年 第3卷 第4期   页码 443-452 doi: 10.1007/s11783-009-0037-0

摘要: The present water pollution situation at watershed level in China has been systematically analyzed. The causes of water pollution are attributed to the extensive economic developmental pattern, poor wastewater treatment, and a lack of nonpoint pollution control. The problems of water pollution control at watershed level include a lack of thought and approach, developmental delay in the environmental standard system, an inadequate monitoring ability, and an inefficient implementation of laws and regulations. From 2006 to 2020, water pollution control and governance will be a national key specific project of science and technology in China. The strategies of this project include establishing a water pollution control system at watershed level, orienting a healthy aquatic ecosystem, conducting risk management, and using comprehensive methods. The goal is to establish and complete a technological system of pollution control and management in three five-year phases. The main tasks are to develop common technologies, management systems, and mechanisms for lake eutrophication control, river pollution control, urban water environmental pollution control, potable water safety, and water environmental management. The bottlenecks of water pollution control and management in China could be systematically removed, and the demonstration of the system engineering approach will be conducted at selected key watersheds.

关键词: water pollution control     watershed     system engineering     sustainability     integrated watershed management     key specific project of science and technology    

Energy storage resources management: Planning, operation, and business model

《工程管理前沿(英文)》   页码 373-391 doi: 10.1007/s42524-022-0194-4

摘要: With the acceleration of supply-side renewable energy penetration rate and the increasingly diversified and complex demand-side loads, how to maintain the stable, reliable, and efficient operation of the power system has become a challenging issue requiring investigation. One of the feasible solutions is deploying the energy storage system (ESS) to integrate with the energy system to stabilize it. However, considering the costs and the input/output characteristics of ESS, both the initial configuration process and the actual operation process require efficient management. This study presents a comprehensive review of managing ESS from the perspectives of planning, operation, and business model. First of all, in terms of planning and configuration, it is investigated from capacity planning, location planning, as well as capacity and location combined planning. This process is generally the first step in deploying ESS. Then, it explores operation management of ESS from the perspectives of state assessment and operation optimization. The so-called state assessment refers to the assessment of three aspects: The state of charge (SOC), the state of health (SOH), and the remaining useful life (RUL). The operation optimization includes ESS operation strategy optimization and joint operation optimization. Finally, it discusses the business models of ESS. Traditional business models involve ancillary services and load transfer, while emerging business models include electric vehicle (EV) as energy storage and shared energy storage.

关键词: energy storage system     energy storage resources management     planning configuration     operational management     business model    

Applying an Integrated Systems Perspective to the Management of Engineering Projects

Simon P. Philbin

《工程管理前沿(英文)》 2015年 第2卷 第1期   页码 19-30 doi: 10.15302/J-FEM-2015004

摘要: Engineering projects can be subject to significant complexity, which may result in a number of issues and challenges that need to be addressed throughout the project life-cycle. Traditionally projects have been viewed according to the so called “iron triangle,” i. e., achievement of project milestones according to schedule, cost and quality targets. While these targets are fundamentally important to the performance of engineering projects, it is possible to view projects on a systemic level in order to allow an adequate focus on all the underpinning factors that have the potential to influence the performance of projects. Consequently, a management framework has been developed that is based on an integrated systems perspective of engineering projects, where the performance of projects is a function of six contributing sub-systems that are: process, technology, resources, knowledge, culture and impact.

关键词: integrated systems perspective     engineering projects     management    

Exploration and Practice in Systems Engineering Management of Large Coal-based Integrated Energy Projects

Wen Ling

《工程管理前沿(英文)》 2015年 第2卷 第2期   页码 173-177 doi: 10.15302/J-FEM-2015029

摘要: With an analysis of current development of China’s coal industry, this paper, in the perspectives of concept innovation, technological innovation and management innovation, introduces the exploration and engineering practice by Shenhua Group in coordination with coal and the environment, co-development of coal and the associated resources as well as clean and efficient utilization of coal. Based on systems engineering of Shenhua’s coal-based integrated energy projects, the paper also presents practice and experience in technological and management innovation.

关键词: coal-based     integrated energy     systems engineering     exploration     practice    

The origins of schedule management: the concepts used in planning, allocating, visualizing and managing

Lynda M. BOURNE, Patrick WEAVER

《工程管理前沿(英文)》 2018年 第5卷 第2期   页码 150-166 doi: 10.15302/J-FEM-2018012

摘要: Getting the in the at the has always been a major organizational challenge. In ancient times this process seems to have been accomplished based on the scheme of arrangements being contained in the leader’s mind and instructions communicated verbally. Modern approaches to solving the twin challenges of first thinking through the ‘plan’ and then communicating the plan to the people who need to do ‘ ’ use sophisticated graphics, charts, diagrams, and computations. This paper traces the development of the concepts most project managers take for granted including bar charts and critical path schedules from their origins (which are far earlier than most people think) through to the modern day. The first section of the paper looks at the development of concepts that allow the visualization of time and other data. The second looks at the shift from static representations to dynamic modeling through the emergence of computers, dynamic calculations and integrated data from the 1950s to the present time.

关键词: time management     scheduling     CPM     PERT     Gantt     Critical Path     bar chart    

Airline planning and scheduling: Models and solution methodologies

Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE

《工程管理前沿(英文)》 2020年 第7卷 第1期   页码 1-26 doi: 10.1007/s42524-020-0093-5

摘要: The airline industry is a representative industry with high cost and low profitability. Therefore, airlines should carefully plan their schedules to ensure that overall profit is maximized. We review the literature on airline planning and scheduling and focus on mathematical formulations and solution methodologies. Our research framework is anchored on three major problems in the airline scheduling, namely, fleet assignment, aircraft routing, and crew scheduling. General formulation, widely used solution approaches, and important extensions are presented for each problem and integrated problems. We conclude the review by identifying promising areas for further research.

关键词: airline planning     fleet assignment problem     aircraft routing problem     crew pairing problem     crew rostering problem     crew scheduling problem     integrated planning    

An integrated assessment method of urban drainage system: A case study in Shenzhen City, China

DONG Xin, ZENG Siyu, CHEN Jining, ZHAO Dongquan

《环境科学与工程前沿(英文)》 2008年 第2卷 第2期   页码 150-156 doi: 10.1007/s11783-008-0014-z

摘要: In recent years, the urban drainage system in China is facing the dual pressure of renovation and construction. This requires that the integrated assessment for the planning and operation of the urban drainage system is obligatory. To evaluate the urban drainage system, an integrated assessment methodology based on the analytic hierarchy process (AHP), integrated simulation, and fuzzy assessment is established. This method is a multi-criteria decision adding app roach to the assessment of the urban drainage system comprehensively. Through the integration of the Storm Water Management Model (SWMM), a simple wastewater treatment plant model, and a surface water quality model, an integrated modelling system for the urban drainage system is developed and applied as a key tool for assessment. Using the established method, a case study in Shenzhen City has been implemented to evaluate and compare two urban drainage system reno vation plans, the distributed plan and the centralized plan. Because of the particularity of this case study, the established method is not applied entirely. Considering the water environ mental impact, ecological impact, technological feasibility, and economic cost, the integrated performance of the distri buted plan is better. As shown in this case study, the proposed method is found to be both effective and practical.

关键词: integrated assessment     hierarchy process     centralized     technological feasibility     planning    

Integrated river basin management in rapidly urbanizing areas: a case of Shenzhen, China

Lei LIU, Xiaoming MA

《环境科学与工程前沿(英文)》 2011年 第5卷 第2期   页码 243-254 doi: 10.1007/s11783-010-0276-0

摘要: The rapid urbanization of China is causing a burden on their water resources and hindering their sustainable development. This paper analyzes effective methods to integrated river basin management (IRBM) using Longgang River basin of Shenzhen as an example, which is the city with the fastest rate of urbanization in China and even the whole world. Over the past 20 years, China has undergone a population boom due to the increase of immigrant workers and rapid development of labor-intensive industries, which led to the sharp increase of water consumption and sewage discharge. However, the construction of the water infrastructure is still lagging far behind the environmental and social development, with only 32.7% of sewage in the district being treated. Currently, every water quality indicator of the Longgang River basin was unable to meet the required corresponding environmental standards, which further aggravated the water shortages of the region. Thus, an analytical framework is proposed to address the IRBM of the study area. The problems with the current management system include the lack of decentralization in decision-making, lack of enforcement with redundant plans, weak management capacity, financial inadequacy, and a poor system of stakeholder participation. In light of the principles of IRBM and the situation of the region, corresponding measures are put forward, including an increase of power given to sub-district offices, fewer but more feasible plans, capacity building among stakeholders, a combination of planning and marketing for overcoming financial inadequacy, and profound reform in the public participation system. The framework and institutional suggestions could inform similar processes in other representative river basins.

关键词: integrated river basin management (IRBM) model     Longgang River basin     Shenzhen     decentralization     stakeholder participation    

标题 作者 时间 类型 操作

Analysis of Sydney’s recycled water schemes

Zhuo CHEN, Huu Hao NGO, Wenshan GUO, Xiaochang WANG

期刊论文

Computer aided process planning system based on workflow technology and integrated bill of material tree

LU Chun-guang, MENG Li-li

期刊论文

Water environmental planning and management at the watershed scale: A case study of Lake Qilu, China

HUANG Kai, GUO Huaicheng, LIU Yong, ZHOU Feng, YU Yajuan, WANG Zhen

期刊论文

A comparison of the water management systems in France and China

Xiaoliu YANG, Jian XU, Jean-Fran?ois DONZIER, Coralie NOEL

期刊论文

Enterprise-wide optimization of integrated planning and scheduling for refinery-petrochemical complex

期刊论文

Integrated transmission and generation planning model in a deregulated environment

Enrique B. CEDE?O, Sant ARORA

期刊论文

Optimization of multi-objective integrated process planning and scheduling problem using a priority based

Muhammad Farhan AUSAF,Liang GAO,Xinyu LI

期刊论文

System engineering for water pollution control at the watershed level in China

Wei MENG,

期刊论文

Energy storage resources management: Planning, operation, and business model

期刊论文

Applying an Integrated Systems Perspective to the Management of Engineering Projects

Simon P. Philbin

期刊论文

Exploration and Practice in Systems Engineering Management of Large Coal-based Integrated Energy Projects

Wen Ling

期刊论文

The origins of schedule management: the concepts used in planning, allocating, visualizing and managing

Lynda M. BOURNE, Patrick WEAVER

期刊论文

Airline planning and scheduling: Models and solution methodologies

Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE

期刊论文

An integrated assessment method of urban drainage system: A case study in Shenzhen City, China

DONG Xin, ZENG Siyu, CHEN Jining, ZHAO Dongquan

期刊论文

Integrated river basin management in rapidly urbanizing areas: a case of Shenzhen, China

Lei LIU, Xiaoming MA

期刊论文